SB 665 / HB 356 Chapter 122 · Section A(9)

Residential Development Application Reporting

Building Permits — Arlington County

31,328 residential building permits, 2012-2026, from Arlington’s open data portal — real data, refreshed daily.

Building permits are not what SB 665 asks for. A permit authorizes construction; Section A(9) covers the land-entitlement decisions that come first — rezonings, site plans, subdivisions. This tab shows what a locality with good permit data can already publish. The SB 665 Development Applications tab shows what the bill actually requires.

Residential Permits

31,328

2012-2026

New Construction

4,659

15% of permits

Total Permit Value

$3.8B

Additions + alterations + new

Data Source

Arlington Open Data

347,903 total records

Residential Permits Filed by Work Type

Counted by application date — a bar is when the permit was filed, whether or not it was ever issued. 2012-2026. One row per permit.

New Construction
Additions
Alterations
Other

Residential Permit Locations

One dot per permit, placed from coordinates in the county extract. Coloured by work type — the only category Arlington records. Shows new construction by default; filter by year and work type.

Loading Arlington map...

Residential New Construction — Cohort State Distribution Over Time

Arlington residential new construction permits, applications 2012 onward (PermitSubTypeCode 'RNEW' under Permits Plus, 'New' under Permit Arlington). The Closed/Finaled band only appears from 2022: Permits Plus recorded no completion date, so earlier cohorts show as Issued indefinitely even though about 78% of them did final — read the missing green as unrecorded, not as unfinished. One row per filed permit. Note that townhouse buildings are filed as one permit per unit by Arlington, so they are counted accordingly. At each day t, every application is in exactly one of: In Review, Issued (active), Closed/Finaled, or Rejected/Expired. In-Review applications turn red after the SB 665 12-month threshold. Bands are shares of the permits actually observed to day t, not of the whole cohort — a permit filed last month says nothing about day 200, so it is excluded there rather than counted as still in review. Each chart therefore stops where its remaining sample gets too thin (the 'obs' figure), which is why recent cohorts run shorter. All cohorts share the same 0–2 year x-axis so they can be compared at a glance.

In Review (≤1yr) / In Review (>1yr)
Issued
Closed/Finaled
Rejected/Expired
2012144 applied · obs 730d
2013186 applied · obs 730d
2014234 applied · obs 730d
2015379 applied · obs 730d
2016344 applied · obs 730d
2017356 applied · obs 730d
2018334 applied · obs 730d
2019282 applied · obs 730d
2020207 applied · obs 730d
2021255 applied · obs 730d
2022422 applied · obs 730d
2023386 applied · obs 730d
2024452 applied · obs 730d
2025455 applied · obs 535d
2026223 applied · obs 180d

Processing Time (Applied → Issued)

Days from application to issuance, counting only permits that were issued. This is how long approval takes, not how long a pending application has been waiting.

Work TypePermitsMedianMean90th %ile
New Construction4,057110d135d230d
Additions13,04835d56d128d
Alterations10,6948d16d35d

Application Outcomes by Year

YearTotalClosedP<1yP>1yDen/Wd
20121,4371,345-47-
20131,4471,366-58-
20141,6461,568-35-
20152,4792,290-79-
20162,4782,105-127-
20172,5202,112-136-
20182,5591,941-168-
20192,4921,521-288-
20201,4851,048-149-
20211,657816-169-
20222,005789-2841
20232,363938-353-
20242,522985-365-
20252,752942174195-
20261,486150705--

SB 665 / HB 356 — Section A(9)

Localities over 3,500 population must report residential development applications submitted, approved and denied each year — with unit counts, unit types, tenure, affordability targeting and permitted density. Some localities already publish parts of this; Section A(9) makes the reporting uniform statewide.